Elterma

Search page
Advanced search

Preheating furnaces for forges and foundry

Supply systems/Nominal temperature:

gas fired furnaces: 150 – 1300oC
electrically heated: 150 – 1150oC

Max load weight and dimensions:

according to the customers needs

SECO/WARWICK ThermAL S.A. furnaces are used in the processes of charge preheating before the right technological process takes place. Preheating furnaces are applied as single units or can work with other plants as part of complete processing lines or groups. The preheating furnaces design provides uniform charge heating.

 

Workloads:

  • steel loads (elements of automotive, tools industry; bearings elements, metallurgical elements),
  • loads of non-ferrous materials and its alloys,
  • metal moulds of cast steel and cast iron,
  • welded constructions and castings.

 

Protective atmosphere:

  • gas protective atmosphere of nitrogen – hydrogen mixture,
  • regulated atmosphere,
  • nitrogen atmosphere.

 

Applications:

  • before press hardening,
  • before hot working – forging, rolling, pressing and press-forming,
  • before solution heat treatment.

 

Equipment type: